Wednesday, August 29, 2012

Going Up

Frames have (mostly) been put up on the First Floor.  We have a better sense of the overall shape of the house.  What will make the shell complete will be the roof trusses (the most complex part of this house).

 Here we see the bay windows of the upstairs bedrooms.  This photo was taken from the living room (so when finished there will be a ceiling here).
View from family room to the upstairs hallway from the family room/meals area.

 Where the stairway will be.


Garage and the storage area above.
 View from the street.

Wednesday, August 22, 2012

Beams on - ready to go up

Things have slowed due to issues with some of the windows.  That has been rectified and now the beams have gone up ready for putting the joist on as the platform for the upper story.  
Here we see the rear (north side of the house) which will have full height windows on the ground level and a set of fixed windows on the upper story to allow light in to fill the void. 

At the front of the house we have beams at the front and also in the garage to support the storage area above the garage.

View from the side street of the rear of the house.

Sunday, July 22, 2012

Ground floor frames

Yesterday Muhsina and I visited the building site and walked through the ground framework of the house. Below is a 15minute video of the walkthrough. Although we get a better sense of the space now, I don't think we will appreciate how large or small the areas are until the gyprock walls are installed. 

 The south east "bull nose" of the house (Lounge room).
 Muhsina's bay window
 Prayer and Lounge rooms
Sliding doors and windows waiting to be installed - hopefully Monday.

Thursday, July 19, 2012

Frames and Kitchen design

The frames have been delayed slightly due to complications with the complex roof design.  Whilst we are waiting for the frames to be put up (hopefully start tomorrow), I thought I'd share the kitchen design with you.  Taha from Tradeco Interiors put this design together and will be building the kitchen, laundry and the custom vanity in the main bathroom.  

Sunday, July 8, 2012

The floor slab

The ground floor slab was poured on the morning of Friday 6 July.   By mid-day they were still smoothing over the surface.  By Saturday morning it was all dry and we could walk around.  





Saturday, June 30, 2012

Preparation for the slab

Does not seem like a lot of progress this week but the drainage etc seems to be ready. I suspect next will be the wafflepods, laying down the hydronic heating and the slab.

Here are the kids in the kitchen with Muhsina washing the dishes and Afzal eating a burger near the stove.

Sunday, June 24, 2012

Building has commenced

 With the markings in place, the machines were due in on Thursday 21 June. So the family and Firas from Nablus got together for a sod-turning ceremony.

We had to get Afzal to the ANU so we took this photo before Mizaan could get there from work.







Mizaan for his photo-shoot - looking very dapper.











On Saturday 23 June Jumanah and I visited the site after her soccer game to see the commencement of the laying of the drainage pipes and preparation for the footings.